PROJECT SUMMARY

SUMMARY OF PROJECTS EXECUTED BY PIVIC ENERGY LIMITED

  • Welding of 2 dissimilar metals using SMAW with high strength electrode (E9018) in a controlled environment aided by heat blanket.
  • Carried out non-destructive test on repaired joint successively at intervals of 24, 48, and 72 hrs respectively, using UT and MPI.
  • Project close out/signing off job completion certificate.
  • Analysis/review of AFC drawings and produced/prepared WBS as well as project cost breakdown ie. Technical and commercial tender document for turnkey project accompanied by site survey/visit.
  • Mobilisation of personnel, materials, consumables, equipment as well as logistics requirements.
  • Pre fabrication of component parts as per AFC drawing onshore using SMAW, and carry out non-destructive test as well as blasting and coating of all parts prior to field installation/assembly.
  • Handling of component parts and onward delivery/freighting to offshore location (FRIGG).
  • Setting out of layout and installation/assembly of all component parts using SMAW.
  • Conducted MPI and coated all exposed weld joints prior to load test, and post-load test MPI on joints.
  • Project closeout/signing off job completion certificate.
  • Milling, turning and threading of M72 heavy duty bolts.
  • Case-hardening of machined bolts prior to delivery.
  • Project close out/signing off job completion certificate.
  • Cutting of 12m length of 30”x1” conductor pipe to desired/required length using cold cutting technology as well as bevelling of same.
  • Fitting/alignment and welding of adaptor to 30”x1” conductor pipe using combination of SMAW and TIG.
  • Conducted post weld heat treatment on welded joint to relieve thermal/residual stress on weld joint.
  • Carried out non-destructive test (MPI) on welded joint prior to paint application.
  • Project close out/signing off job completion certificate.
  • Cutting and bevelling of 30”x1” conductor pipe to required length and angle using cold cutting technique.
  • Fitting/alignment and welding of landing ring to 30”x1” conductor pipe using combination of SMAW and TIG.
  • Conducted post weld heat treatment on welded joint to relieve thermal/residual stress on weld joint.
  • Carried out non-destructive test (MPI) on welded joints.
  • Project closeout/signing of job completion certificate.

ADDRESS

Kobarop Plaza
Plot 21A King Perekule Street
G.R.A Phase II, Port Harcourt
Rivers State, Nigeria

OFFICE LINE

+234(0)907-6115-562
+234(0)818-1832-573
+234(0)8033-422-330

EMAIL

info@pivicenergyltd.com

ADDRESS

Kobarop Plaza
Plot 21A King Perekule Street
G.R.A Phase II, Port Harcourt
Rivers State, Nigeria

OFFICE LINE

+234(0)907-6115-562
+234(0)818-1832-573
+234(0)8033-422-330

EMAIL

info@pivicenergyltd.com